电话:028-83223983 65819088
                87711546
手机:13618037680
传真:028-83223983
Email:cdxin.rui@163.com
   
测绘技术装备建设讨论会在京召开
作者:成都新瑞测绘  来源:国家测绘局财务司  浏览:966次  更新:2009/10/2 14:27:44

        为加强测绘技术装备建设,提高测绘生产服务效率,满足信息化测绘体系建设的需要,9月29日,国家测绘局邀请有关专家,在北京组织召开“测绘技术装备建设讨论会”。与会专家就如何加强测绘技术装备建设进行了充分的讨论,提出了许多值得借鉴的宝贵意见。国家测绘局副局长王春峰出席了会议并讲话。

 

  王春峰指出,目前,加紧规划测绘技术装备建设专项,通过项目建设,解决数字化测绘技术装备短缺问题、老化问题、能力不强问题,大力提高测绘对经济社会发展的基础保障能力和应急服务能力,是推动测绘进一步转型,实现信息化测绘的重要基础工作,也是测绘系统上上下下一致的愿望。现阶段,要投入多方面的力量,群策群力,将这项目设计好,将各项基础工作做好,并将该项目纳入“十二五”规划,报送有关部门立项后尽快实施。

 

  王春峰强调,在项目前期规划阶段,要体现创新的精神,在做好基础测绘能力建设规划的同时,重点要规划好应急保障能力建设、安全保密装备建设以及测绘外业安全生产及生活保障系统建设等,进一步提高测绘应急服务能力,并在测绘系统中进一步贯彻以人为本理念。同时要注重研究国际技术发展水平,促使我国测绘由测绘大国向测绘强国转变。

 

  王春峰最后要求课题组要加快工作进度,力争近期完成项目规划和项目建设书编制,并尽快上报。

 

 

 

 

To strengthen the building of surveying and mapping technology and equipment to improve the efficiency of surveying and mapping production services to meet the information needs of building surveying and mapping system, September 29, the State Bureau of Surveying and Mapping invite relevant experts, in Beijing, the organization held a "surveying and mapping technology and equipment-building seminars." The participating experts on how to strengthen the building of surveying and mapping technology and equipment to conduct a full discussion, put forward much to learn from their valuable advice. WANG Chun-feng, deputy director the State Bureau of Surveying and Mapping, attended the meeting and delivered speeches.

Chun-Feng Wang pointed out that, at present, actively planning the building of specialized surveying and mapping technology and equipment, through the project to address the digital mapping technology and equipment shortages, aging issues, capacity is not strong issue, vigorously improve the mapping on the basis of economic and social development support capabilities and emergency services capabilities, is surveying and mapping to further promote the transformation of information technology to achieve an important foundation for the work of surveying and mapping, but also mapping system up and down the same aspirations. At this stage to put a wide range of power, to bring this project design is good, the foundation will do a good job, and included in the project, "Shier Wu" plan, submitted to the relevant departments as soon as the implementation of the project.


Chun-Feng Wang emphasized that the project pre-planning stage, should embody the spirit of innovation in the successful mapping capabilities-based construction plan, while focusing on good emergency support to plan for capacity-building, security equipment, building and surveying and mapping, field safety in production and daily life support system construction and so on, to further enhance the capacity of emergency services, surveying and mapping, and mapping system to further implement the people-oriented concept. At the same time we should pay attention to study international level of technological development to make China's Mapping Mapping powers made by the powerful mapping changes.


WANG Chun-feng finally asked Task Force to speed up the progress of work, and strive to recently completed construction of the book project planning and project preparation, and to report as soon as possible.
 
 
返回列表 | 打印本页 | 返回顶部 
地址:成都市营门口路18号附44号 电话:028-83223983 87711546 传真:028-83223983 Email:cdxin.rui@163.com
版权所有 © 成都新瑞测绘仪器有限公司 技术支持:仕航软件 备案号:蜀ICP备09012819号-1