作者:韦纯训 洪瑛
9月20日,云南省测绘局西部测图工程前线指挥部召开首次监理协调会。会议由陕西质检站监理代表主持,局领导小组成员、前线指挥部成员、局质检人员、工程院管理人员参加会议。
会上,测区负责人汇报了生产计划执行、测区工作进展、质量控制、安全措施等情况,并提出了存在的问题、解决办法,以及下一步的工作思路。局领导小组成员倪津做了总结发言,并对测区工作提出了具体要求。
监理代表就前期云南省测绘局提交的生产准备材料情况做了说明,并明确提出了监理要求、监理内容、以及下一步的监理安排,通过征求与会者意见,形成了监理协调记录。
会议要求,要保证项目生产的有序性和可控性,使成果质量达到西部测图工程的总体质量要求。横断山脉地形复杂,交通条件较差,作业区域内自然灾害频发,要做好外业生产所需交通、通讯、急救、后勤工作,确保人身安全、交通安全、数据资料安全,全面落实西部测图“安全工程” 各项目标要求,确保西部测图“安全生产年”不发生安全事故。
September 20, western Yunnan Province Bureau of Surveying and Mapping Surveying and Mapping Engineering Command held its first front-line supervision of the CPC. The meeting was chaired by a representative of Shaanxi Quality Supervision, Inspection station supervision, the Council leadership team members, front-line command members of the Bureau of Quality Supervision, Inspection personnel, management personnel Academy of Engineering, attended the meeting.
At the meeting, head of the surveyed area, reported on the implementation of production plans, the progress of the surveyed area, quality control, safety measures, etc., and put forward their problems, solutions, and the next step work plans. Bureau and members of the group Ni Jin made a concluding statement, and test areas to work and put forward specific requirements.
Supervision on behalf of Surveying and Mapping Bureau of Yunnan Province on the pre-production preparation materials submitted by the situation, and so described, and clearly put forward the supervision requirements, supervision content, and supervision arrangements for the next step by seeking the views of the participants, forming a supervisory co-ordination records.
The meeting called for, to ensure that the project produced an orderly and controllable, so that the quality of the results to the general western mapping project quality requirements. Hengduan Mountains terrain, poor transportation conditions, operating in the region of natural disasters, we should do a good job outside the industry, production of the necessary transport, communications, first aid, logistics, to ensure personal safety, traffic safety, data security, full implementation of the Western test map "Safety Engineering" of the objectives and requirements, to ensure that the western mapping "safe production" The non-occurrence of security incidents. |