吉林圆满完成坐标系转换工作 |
作者:成都新瑞测绘 来源:中国测绘宣传中心 浏览:950次 更新:2010/3/1 10:06:42 |
作者:周守勇
Recently, by the Geomatics Center of Jilin Province, Jilin Province, 1980 Xi'an commitment to the 2000 National Geodetic Coordinate System coordinates the overall conversion system project acceptance by experts. The project was established in Jilin Province, Xi'an in 1980 within the framework of a unified coordinate system to the 2000 national geodetic coordinate system transformation numerical model as a whole, coordinate transformation to achieve centimeter-level accuracy. The Group believes that the correct theoretical basis for the project deliverables, technical scientific and rational route to achieve the project targets, achieved the control points, topographic maps from 1980 to 2000, Xi'an National Geodetic coordinate system coordinate system conversion, fully meet the basic needs of surveying and mapping work, results innovative. At the same time, the system also has topographic map contour coordinate transformation to correct the number of computing power, surveying and mapping products for the 4D coordinate system conversion provides a data base. |
上一个:宁波市全面开展基础测绘“十二五”规划编制工作 下一个:青海加大基础测绘装备投入力度 |
![]() ![]() ![]() |